Document NameDocument DescriptionFiles
SUPPLEMENTAL INSTRUCTION #01Deletion of Electrical Closet – December 8, 2017Download
SUPPLEMENTAL INSTRUCTION #02Lintel Clarification – January 5, 2018Download
SUPPLEMENTAL INSTRUCTION #03Masonry Re-bar Modification – January 8, 2018Download
SUPPLEMENTAL INSTRUCTION #04Revised Issued for Construction Drawings – January 19, 2018Download
SUPPLEMENTAL INSTRUCTION #05Temporary Shoring on Damaged concrete beam at Grid 10/cDownload
SUPPLEMENTAL INSTRUCTION #06Additional & Updated specs for Fibre Cement Panel & Metal SidingDownload
SUPPLEMENTAL INSTRUCTION #07Door Schedule & Updated SpecsDownload
SUPPLEMENTAL INSTRUCTION #08Updated Structural Drawings PH1Download
SUPPLEMENTAL INSTRUCTION #09Updated Structural Drawings PH2Download
SUPPLEMENTAL INSTRUCTION #10Repair Damaged Concrete BeamDownload
SUPPLEMENTAL INSTRUCTION #11Updated Mechanical & Electrical drawings for TenderDownload
SUPPLEMENTAL INSTRUCTION #12Revision to kitchen wall furring; Door 109.1Download
SUPPLEMENTAL INSTRUCTION #13Revised Universal Toilet Room LayoutDownload
SUPPLEMENTAL INSTRUCTION #14Revised Ceiling LayoutDownload
SUPPLEMENTAL INSTRUCTION #15Updated Window Schedule Drawing A3.03Download
SUPPLEMENTAL INSTRUCTION #16Structure Masonry Lintel and Beam at new openings Grid H.Download
SUPPLEMENTAL INSTRUCTION #17Exposed Acoustic Deck over Gym AdditionDownload
SUPPLEMENTAL INSTRUCTION #18Revision to structural block walls at parapets at gymnasium roofDownload
SUPPLEMENTAL INSTRUCTION #19Updated Architectural Drawings due to 19-JAN-18 changesDownload
SUPPLEMENTAL INSTRUCTION #20Flow Control Roof DrainsDownload
SUPPLEMENTAL INSTRUCTION #21Transfer Ducts Multipurpose RoomDownload
SUPPLEMENTAL INSTRUCTION #22Rain Water Leader at Multipurpose RoomDownload
SUPPLEMENTAL INSTRUCTION #23Repair Existing Block at Grid Line 4a-HDownload
SUPPLEMENTAL INSTRUCTION #24Universal Washroom ElectricalDownload
SUPPLEMENTAL INSTRUCTION #25Exterior LightingDownload
SUPPLEMENTAL INSTRUCTION #26Relocate Sanitary ConnectionDownload
SUPPLEMENTAL INSTRUCTION #27Gypsum BulkheadDownload
SUPPLEMENTAL INSTRUCTION #28Revision to Lighting ControlsDownload
SUPPLEMENTAL INSTRUCTION #29Revision to Rain Water Leader at Gym, New Sanitary Connections
SUPPLEMENTAL INSTRUCTION #30Exterior Light Locations and Quantities
SUPPLEMENTAL INSTRUCTION #31Paint Colour PT1 and Locations
SUPPLEMENTAL INSTRUCTION #32Relocate Sanitary and Storm Connections
SUPPLEMENTAL INSTRUCTION #33Revised Sanitary Connection
SUPPLEMENTAL INSTRUCTION #34Accent Wall Location Clarification
SUPPLEMENTAL INSTRUCTION #35Revised parapet at Grid K
SUPPLEMENTAL INSTRUCTION #36Filled block courses at gym
SUPPLEMENTAL INSTRUCTION #37Washroom Ceiling Layout
SUPPLEMENTAL INSTRUCTION #38Revision to shower plumbing wall
SUPPLEMENTAL INSTRUCTION #39Exterior Finishes Summary
SUPPLEMENTAL INSTRUCTION #40Kitchen Hand Faucet
SUPPLEMENTAL INSTRUCTION #41Clay Pipe Connections
SUPPLEMENTAL INSTRUCTION #42Parapet at Grid x2
SUPPLEMENTAL INSTRUCTION #43Fan Controller
SUPPLEMENTAL INSTRUCTION #44Wall at Curtain Wall Corners
SUPPLEMENTAL INSTRUCTIONS #45Change to lighting fixtures in corridor RM119