| Document Name | Document Description | Files |
| SUPPLEMENTAL INSTRUCTION #01 | Deletion of Electrical Closet – December 8, 2017 | Download |
| SUPPLEMENTAL INSTRUCTION #02 | Lintel Clarification – January 5, 2018 | Download |
| SUPPLEMENTAL INSTRUCTION #03 | Masonry Re-bar Modification – January 8, 2018 | Download |
| SUPPLEMENTAL INSTRUCTION #04 | Revised Issued for Construction Drawings – January 19, 2018 | Download |
| SUPPLEMENTAL INSTRUCTION #05 | Temporary Shoring on Damaged concrete beam at Grid 10/c | Download |
| SUPPLEMENTAL INSTRUCTION #06 | Additional & Updated specs for Fibre Cement Panel & Metal Siding | Download |
| SUPPLEMENTAL INSTRUCTION #07 | Door Schedule & Updated Specs | Download |
| SUPPLEMENTAL INSTRUCTION #08 | Updated Structural Drawings PH1 | Download |
| SUPPLEMENTAL INSTRUCTION #09 | Updated Structural Drawings PH2 | Download |
| SUPPLEMENTAL INSTRUCTION #10 | Repair Damaged Concrete Beam | Download |
| SUPPLEMENTAL INSTRUCTION #11 | Updated Mechanical & Electrical drawings for Tender | Download |
| SUPPLEMENTAL INSTRUCTION #12 | Revision to kitchen wall furring; Door 109.1 | Download |
| SUPPLEMENTAL INSTRUCTION #13 | Revised Universal Toilet Room Layout | Download |
| SUPPLEMENTAL INSTRUCTION #14 | Revised Ceiling Layout | Download |
| SUPPLEMENTAL INSTRUCTION #15 | Updated Window Schedule Drawing A3.03 | Download |
| SUPPLEMENTAL INSTRUCTION #16 | Structure Masonry Lintel and Beam at new openings Grid H. | Download |
| SUPPLEMENTAL INSTRUCTION #17 | Exposed Acoustic Deck over Gym Addition | Download |
| SUPPLEMENTAL INSTRUCTION #18 | Revision to structural block walls at parapets at gymnasium roof | Download |
| SUPPLEMENTAL INSTRUCTION #19 | Updated Architectural Drawings due to 19-JAN-18 changes | Download |
| SUPPLEMENTAL INSTRUCTION #20 | Flow Control Roof Drains | Download |
| SUPPLEMENTAL INSTRUCTION #21 | Transfer Ducts Multipurpose Room | Download |
| SUPPLEMENTAL INSTRUCTION #22 | Rain Water Leader at Multipurpose Room | Download |
| SUPPLEMENTAL INSTRUCTION #23 | Repair Existing Block at Grid Line 4a-H | Download |
| SUPPLEMENTAL INSTRUCTION #24 | Universal Washroom Electrical | Download |
| SUPPLEMENTAL INSTRUCTION #25 | Exterior Lighting | Download |
| SUPPLEMENTAL INSTRUCTION #26 | Relocate Sanitary Connection | Download |
| SUPPLEMENTAL INSTRUCTION #27 | Gypsum Bulkhead | Download |
| SUPPLEMENTAL INSTRUCTION #28 | Revision to Lighting Controls | Download |
| SUPPLEMENTAL INSTRUCTION #29 | Revision to Rain Water Leader at Gym, New Sanitary Connections |
|
| SUPPLEMENTAL INSTRUCTION #30 | Exterior Light Locations and Quantities |
|
| SUPPLEMENTAL INSTRUCTION #31 | Paint Colour PT1 and Locations | |
| SUPPLEMENTAL INSTRUCTION #32 | Relocate Sanitary and Storm Connections | |
| SUPPLEMENTAL INSTRUCTION #33 | Revised Sanitary Connection | |
| SUPPLEMENTAL INSTRUCTION #34 | Accent Wall Location Clarification | |
| SUPPLEMENTAL INSTRUCTION #35 | Revised parapet at Grid K | |
| SUPPLEMENTAL INSTRUCTION #36 | Filled block courses at gym | |
| SUPPLEMENTAL INSTRUCTION #37 | Washroom Ceiling Layout | |
| SUPPLEMENTAL INSTRUCTION #38 | Revision to shower plumbing wall | |
| SUPPLEMENTAL INSTRUCTION #39 | Exterior Finishes Summary | |
| SUPPLEMENTAL INSTRUCTION #40 | Kitchen Hand Faucet | |
| SUPPLEMENTAL INSTRUCTION #41 | Clay Pipe Connections | |
| SUPPLEMENTAL INSTRUCTION #42 | Parapet at Grid x2 | |
| SUPPLEMENTAL INSTRUCTION #43 | Fan Controller | |
| SUPPLEMENTAL INSTRUCTION #44 | Wall at Curtain Wall Corners | |
| SUPPLEMENTAL INSTRUCTIONS #45 | Change to lighting fixtures in corridor RM119 | |