| SUPPLEMENTAL INSTRUCTION #1 – Concrete Upstand at West Slab Edge |
|
SEPTEMBER 23, 2016 |
Download |
| SUPPLEMENTAL INSTRUCTION #2R1 – Elevator Sump Pit Depth |
|
October 21, 2016 |
Download |
| SUPPLEMENTAL INSTRUCTION #2 – Elevator Sump Pit Depth |
|
SEPTEMBER 23, 2016 |
Download |
| SUPPLEMENTAL INSTRUCTION #3R1 – Structural Reinforcing for Architectural Feature Walls at Building Entrances |
|
October 21, 2016 |
Download |
| SUPPLEMENTAL INSTRUCTION #3 – Structural Reinforcing for Architectural Feature Walls at Building Entrances |
|
SEPTEMBER 23, 2016 |
Download |
| SUPPLEMENTAL INSTRUCTION #4 – Revised Dimensions for Cantilevered Boardroom |
|
SEPTEMBER 23, 2016 |
Download |
| SUPPLEMENTAL INSTRUCTION #5 R1 – Slab Edge Revisions |
|
SEPTEMBER 26, 2016 |
Download |
| SUPPLEMENTAL INSTRUCTION #5 – Slab Edge Revisions |
|
SEPTEMBER 23, 2016 |
Download |
| SUPPLEMENTAL INSTRUCTION #6 – Beam Dimensions |
|
SEPTEMBER 28, 2016 |
Download |
| SUPPLEMENTAL INSTRUCTION #7 – West Vestibule Entrance Walls and Canopy |
|
SEPTEMBER 28, 2016 |
Download |
| SUPPLEMENTAL INSTRUCTION #8 – Revisions to ground and 2nd floor partitions/ door schedule. |
|
October 17, 2016 |
Download |
| SUPPLEMENTAL INSTRUCTION #9 – Rebar revisions to elevator wall between grids B/2 to B/3 |
|
October 11, 2016 |
Download |
| SUPPLEMENTAL INSTRUCTION #10 – Typical Half Wall/ Millwork Support Detail |
|
October 12, 2016 |
Download |
| SUPPLEMENTAL INSTRUCTION #11 – 2nd, 3rd, 4th Floor Pour Break at Feature Stair |
|
October 11, 2016 |
Download |
| SUPPLEMENTAL INSTRUCTION #12 – Re-bar revisions to detail 4/ S-200 at Schoeck connections |
|
October 11, 2016 |
Download |
| SUPPLEMENTAL INSTRUCTION #13 – Re-routing of 4″ sprinkler main through vestibule parallel to Grid 1; Revised height of interior vestibule framing/ glazing (AGS-1) to suit structure |
|
April 12, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #14 – Modifications to Communication Risers, General Purpose Outlets, Fire Alarm Horn/ Strobe Layout |
|
October 21, 2016 |
Download |
| SUPPLEMENTAL INSTRUCTION #15 – Clarification of slab edge dimension at Grid A, second floor |
|
October 21, 2016 |
Download |
| SUPPLEMENTAL INSTRUCTION #16 – Expansion Joint Detail at Bridge Structure, 2nd & 3rd Floors, Grid D. |
|
October 26, 2016 |
Download |
| SUPPLEMENTAL INSTRUCTION #17 – NOT USED |
|
|
Download |
| SUPPLEMENTAL INSTRUCTION #18 – Additional Steel Support for cladding fins, four corners of building (3rd, 4th, and roof levels), SSI 011, ASK-25. Revised detailing of soffit panels at underside of 3rd floor level, ASK-20, ASK-21. |
|
October 24, 2016 |
Download |
| SUPPLEMENTAL INSTRUCTION #19 – Revised mechanical opening behind elevator shaft (Grid E/3) |
|
October 21, 2016 |
Download |
| SUPPLEMENTAL INSTRUCTION #20 – Additional reinforcing steel required in beams along grid “D” between 2 and 3 at 2nd, 3rd, 4th floors. |
|
November 8, 2016 |
Download |
| SUPPLEMENTAL INSTRUCTION #21 – Various dimensional clarifications |
|
December 7, 2016 |
Download |
| SUPPLEMENTAL INSTRUCTION #22 – Additional curtain wall to be installed on the North elevation of the test facility. |
|
December 7, 2016 |
Download |
| SUPPLEMENTAL INSTRUCTION #23 – Details of water wall in main atrium (Grid C between 2 & 3) |
|
December 21, 2016 |
Download |
| SUPPLEMENTAL INSTRUCTION #24 – Typical location of water bottle filling stations. |
|
December 21, 2016 |
Download |
| SUPPLEMENTAL INSTRUCTION #25 R1 – Various dimensional and detail clarifications which are to be incorporated into the Architectural “Construction Update” Drawings, dated 2-Feb-17. |
|
February 13, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #26 – Detailing of retaining wall near Grid 1 between G and J. |
|
February 13, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #27 – Various dimensional and detail clarifications which have been incorporated into the Architectural “Construction Update” Drawings (Issued February 2nd, 2017). |
|
February 13, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #28 – Revisions to curtain wall details. |
|
February 13, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #28R1 – Revisions to curtain wall details. |
|
March 22, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #29 – Revisions to curtain wall/ soffit support steel at U.S. of 3rd floor slab. |
|
February 16, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #30 – Required remedial actions for column at grids C/4 from footing to U.S. second floor. |
|
February 16, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #31 – Additional Walker Duct and Kitchen Revisions for Ground Floor/ Electrical Revisions For Mechanical Equipment |
|
February 16, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #32 – Waterfeature Detail located North of Stair C & Ceiling Detail at Mail Room |
|
March 2, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #33 – Additional HSS Support at Underside of 3rd Floor Midpoint of Grids C and D for Soffit Anchors |
|
March 5, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #34 – Surveyor Layout Drawings |
|
March 6, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #35 – Revised Flooring Finish Plan – Ground Floor Ceramic Tile Layout & Orientation |
|
March 7, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #36 – Floors 2, 3 & 4 Typical Electrical/Mechanical/Sprinkler Elevation Drawings for Coordination |
|
March 15, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #36R2 – Floors 2, 3 & 4 Typical Electrical/Mechanical/Sprinkler Elevation Drawings for Coordination |
|
May 9, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #37 – Floor 4 Layout Revision |
|
March 15, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #37R1 – Floor 4 Layout Revision |
|
March 21, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #38 – Revised Room Finish Schedule Rev05 & associated sketches. |
|
March 16, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #38R1 – Revised Room Finish Schedule Rev05 & associated sketches. |
|
March 20, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #39 – Revised Floor 3 Offices |
|
March 16, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #39 R1 – Revised Floor 3 Offices |
|
March 24, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #40 – Electrical Revisions/Detail. |
|
March 21, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #41 – Detailing of reception desk millwork |
|
March 27, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #42 – Architectural Construction Issue Drawing Update dated April 27th, 2017 with Associated ASK’s |
|
May 4, 2017 |
Download |
| SUPPLEMENTAL INSTRUCION #43 – Architectural (Partial) Construction Issue Drawing Update – June 5th, 7th & 9th, 2017 and Revised Finish Schedule (Rev. – 06) PART 1 of 3 |
|
June 9, 2017 |
Download |
| SUPPLEMENTAL INSTRUCION #43 – Architectural (Partial) Construction Issue Drawing Update – June 5th, 7th & 9th, 2017 and Revised Finish Schedule (Rev. – 06) PART 2 of 3 |
|
June 9, 2017 |
Download |
| SUPPLEMENTAL INSTRUCION #43 – Architectural (Partial) Construction Issue Drawing Update – June 5th, 7th & 9th, 2017 and Revised Finish Schedule (Rev. – 06) PART 3 of 3 |
|
June 9, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #44 – Electrical Modifications to Mechanical Equipment (CCN E-7) and Fire Alarm (CCN E-8) |
|
June 15, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #45 – Deletion of Steel Plate on HSS at 3rd Floor Slab in Level in Atrium |
|
June 27, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #46 – Clarification of Parapet Transition/Retaining Wall Locations at Test Facility |
|
June 28, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #47 R1 – Revised Pocket Size for Training Room Office Partitions |
|
July 18, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #47 – Revised Pocket Size for Training Room Office Partitions |
|
July 10, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #48 – Confirmation of Details & Dimensions of Retaining Walls/Deletion of Sloped Retaining Walls |
|
July 14, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #49 – Addition of Foot Grille, Trench Drain, & Catch Basin at Test Facility |
|
July 21, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #50 – Rename/Re-label Room 422 |
|
July 24, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #51 – Water Fill Stations at GYM 132, and Kitchens 203/303/403 |
|
July 31, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #51 – REV01 – Water Fill Stations at GYM 132, and Kitchens 203/303/403 |
|
September 18, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #52 – Architectual Construction Update – Issued July 28, 2017 |
|
August 8, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #53 – Exterior Site Grading Plan – Update |
|
August 23, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #54 R1 – Operable Office Partition at Ground Floor Training Rooms |
|
August 24, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #55 – Kitchen Equipment Drawings & Specifications |
|
August 24, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #56 – Kitchen Equipment Shop Drawings |
|
August 24, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #57 – Issued for Construction Landscape Drawings & Specifications |
|
August 29, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #58 – KITCHEN CORRIDOR HEIGHTS |
|
September 7, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #59 – JUICE/COFFEE BAR REQUIREMENTS |
|
September 20, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #60 – E/V CHARGER LOCATIONS – REVISED SIDEWALK LAYOUT |
|
September 26, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #60 R1 – E/V CHARGER LOCATIONS – REVISED SIDEWALK LAYOUT |
|
September 29, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #61 – Part 1 of 2 – Millwork Revisions |
|
October 4, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #61 – Part 2 of 2 – Millwork Revisions |
|
October 4, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #62 – Misc. Wall & Door Details |
|
October 4, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #63 – Millwork Countertop Clarifications |
|
October 4, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #64 – Test Facility Lighting & Electrical |
|
October 4, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #65 – Furniture Layouts |
|
October 17, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #65 R1 – Furniture Layouts |
|
October 25, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #66 – Test Facility – Cement Board Layout |
|
October 25, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #67 – Universal Washrooms Wall Tile Layout |
|
October 26, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #68 – Printer Station – Glass Partition Clarification |
|
November 9, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #69 – Stairwells A & B – Tile Layout |
|
November 9, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #70 – Cafeteria – Ice Machine & Closer Panel |
|
November 9, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #70 R1 – Cafeteria – Ice Machine & Closer Panel |
|
November 9, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #71 – Ground Floor – I.T. Area Layout Revision |
|
November10, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #72 – Millwork Drawing A791 – Issued for Construction |
|
November14, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #73 – Revised Floor to Exec Office Layout – 225A & 225B |
|
December 1, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #74 – Hold Open Doors & Revised Door Swing on 4th Lobby |
|
December 14, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #75 – Juice Bar – Increased Clearance |
|
December 14, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #76 – Exit Corridors – Firewall Separation Detail |
|
December 14, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #76 R1 – Exit Corridors – Firewall Separation Detail |
|
January 2, 2018 |
Download |
| SUPPLEMENTAL INSTRUCTION #77 – Detail Clarification of Glass Guards & Main Vestibules |
|
December 15, 2017 |
Download |
| SUPPLEMENTAL INSTRUCTION #78 – Lighting at main washrooms 05 & 06 |
|
January 17, 2018 |
Download |
| SUPPLEMENTAL INSTRUCTION #79 – Kitchen Door D115A |
|
January 17, 2018 |
Download |
| SUPPLEMENTAL INSTRUCTION #80 R1 – Kitchen/Cafeteria Countertop Extension |
|
March 2, 2018 |
Download |
| SUPPLEMENTAL INSTRUCTION #81 – 2nd Floor – Addition of Two Work Stations |
|
February 23, 2018 |
Download |
| SUPPLEMENTAL INSTRUCTION #82 – Revised Site Plan – Depressed Curb |
|
February 23, 2018 |
Download |